Tower Internal Manways

{0 Comments}

Contract maintenance workers often will not replace the tray manways unless the tray manway is adjacent to a tower external manway. They reason that once the tray manways that are visible from the tower manway are closed, there is no way for someone to inspect the other trays. This problem is not just common—it is …

Read More…

Tower Final Inspection

{0 Comments}

At a Gulf Coast refinery, the reboiler thermosyphon circulation could not be reestablished after a turnaround. The tower was reopened and a lessthan-alive contract employee was found stuck in the reboiler draw-off nozzle. At the Good Hope Refinery (when I was the technical manager), we once left a complete scaffold (poles, boards, everything) in the …

Read More…

Shear Clips

{0 Comments}

If a tower has a history of tray deck damage due to pressure surge or high liquid level, the mechanical integrity of the trays should be upgraded. This is done by the use of shear clips, as shown in Fig. 8.4. The use of shear clips is not the best way to improve the mechanical …

Read More…

Seal Pans Downcomer

{0 Comments}

The downcomer from the bottom tray is submerged in a seal pan (see Fig. 8.3), to preserve its downcomer seal. I always set the horizontal dimension between the over-flow lip of the seal pan, (dimension y) the downcomer at four inches, so I never have to worry about restricting liquid flow from the bottom tray. …

Read More…