Category: Tower Pressure

Seal Pans Downcomer

{0 Comments}

The downcomer from the bottom tray is submerged in a seal pan (see Fig. 8.3), to preserve its downcomer seal. I always set the horizontal dimension between the over-flow lip of the seal pan, (dimension y) the downcomer at four inches, so I never have to worry about restricting liquid flow from the bottom tray. …

Read More…

Shear Clips

{0 Comments}

If a tower has a history of tray deck damage due to pressure surge or high liquid level, the mechanical integrity of the trays should be upgraded. This is done by the use of shear clips, as shown in Fig. 8.4. The use of shear clips is not the best way to improve the mechanical …

Read More…

Tower Final Inspection

{0 Comments}

At a Gulf Coast refinery, the reboiler thermosyphon circulation could not be reestablished after a turnaround. The tower was reopened and a lessthan-alive contract employee was found stuck in the reboiler draw-off nozzle. At the Good Hope Refinery (when I was the technical manager), we once left a complete scaffold (poles, boards, everything) in the …

Read More…

Tower Internal Manways

{0 Comments}

Contract maintenance workers often will not replace the tray manways unless the tray manway is adjacent to a tower external manway. They reason that once the tray manways that are visible from the tower manway are closed, there is no way for someone to inspect the other trays. This problem is not just common—it is …

Read More…

Inlet Weirs

{0 Comments}

Most trays have outlet weirs devoted to maintaining the downcomer seal. But some trays have inlet weirs too, or inlet weirs, but no outlet weirs. A sketch of an inlet weir is shown in Fig. 8.2. Note the horizontal distance between the downcomer and the inlet weir (dimension x). This distance ought to be equal …

Read More…

Improper Downcomer Clearance

{0 Comments}

The bottom edge of the downcomer from the tray above should be 0.25 to 0.5 in below the top edge of the weir of the tray below. This is called a positive downcomer seal. Without a positive downcomer seal, vapor will flow up the downcomer and displace the downflowing liquid. This will cause flooding due …

Read More…

Loss of Downcomer Seal Due to Leaks

{0 Comments}

The vertical edges to the downcomers are bolted to bars welded to the vessel wall. These are called, “downcomer bolting bars.” Gaskets are often used to tightly seal the edge of the tray downcomer to these bars. If the bolts are loose or if the gaskets are missing, vapor will blow into the downcomer and …

Read More…

Tray Deck Levelness

{0 Comments}

For smaller diameter towers a visual check of tray deck levelness is sufficient. For two-pass trays, a small diameter tower is less than 8 ft. For single-pass trays, a diameter of less than 6 ft is small.For towers of 10 ft or more in diameter, check for out-of-levelness of a tray check using a carpenter’s …

Read More…

Internal Reflux Evaporation

{0 Comments}

The tray temperatures in our preflash tower, shown in Fig. 6.4, drop as the gas flows up the tower. Most of the reduced sensible-heat content of the flowing gas is converted to latent heat of evaporation of the downflowing reflux. This means that the liquid flow, or internal reflux rate, decreases as the liquid flows …

Read More…

Conversion of Sensible Heat to Latent Heat

{0 Comments}

When we raise the top reflux rate to our preflash tower, the tower-top temperature goes down. This is a sign that we are washing out from the upflowing vapors more of the heavier or higher-molecular-weight components in the overhead product. Of course, that is why we raised the reflux rate. So the reduction in tower-top …

Read More…