Wellhead Surface Equipment

Surface Equipment – Condensate Tank

Posted on October 10, 2009

Maintaining the low pressure separator at too high a pressure can cause the natural gasoline condensate holding tank to over-pressure. As a rough approximation, about…

Wellhead Surface Equipment

Surface Equipment – Low Pressure Three Phase Separator

Posted on October 10, 2009

The high pressure liquid flows into the low pressure separator. Typically the low pressure vessel operates at 30 to 60 psig. Below 20 psig, there…

Wellhead Surface Equipment

Surface Equipment – High Pressure Separator

Posted on October 10, 2009

To prevent metering difficulties, and to reduce corrosion and pressure drop in downstream piping, liquids are removed from wellhead gas. Water plus natural gasoline condensate…

Wellhead Surface Equipment

Surface Equipment – Heater Operation

Posted on October 10, 2009

Why are there two chokes shown in figure 3—2. Certainly, gas flow could be controlled with a single choke. One reason is that the erosion…

Wellhead Surface Equipment

Surface Equipment – Cassing Pressure

Posted on October 10, 2009

Ideally, there should not be any gas accumulation inside the casing of a single completion well. If gas does infiltrate the annular space between the…

Wellhead Surface Equipment

Surface Equipment – Wellhead Tree

Posted on October 10, 2009

My initial impression of the collection of valves sitting atop a gas well was that the assemblage of hardware was unnecessarily complex. This turns out…

Ideas To Enhance Gas Flow

Enhancing Gas Flow – The Birth and Dead of Gas Well

Posted on October 10, 2009

When a well is completed, it must be cleared of sand before it’s production can be lined up to the collection laterals. This is accomplished…

Treater Vessels Sizing

Example Sizing a Vertical Treater

Posted on October 6, 2009

Given: Oil gravity = 40°API, 0.875 S.G. Oil flow rate = 2,000 bpd Inlet oil temperature = 90°F Water S.G. = 1.04 Inlet BS&W =…

Treater Vessels Sizing

Example Sizing a Horizontal Treater

Posted on October 6, 2009

Given: Oil gravity = 30°API, 0.875 S.G. Oil flow rate = 5,000 bpd Inlet oil temperature = 80°F Water S.G. = 1.04 Inlet BS&W =10%…

Ideas To Enhance Gas Flow

Enhancing Gas Flow – Jet Enjectors

Posted on October 4, 2009

Figure 2—2 shows how high pressure gas from the tubing side of dual completion can be employed to compress the low pressure casing gas. An…

Posts navigation

Previous Page Page 1 … Page 72 Page 73 Page 74 … Page 110 Next Page

Pages

  • Contact Us
  • Privacy Policy
  • Terms

Categories

  • Acid Gas Treating
  • Article
  • Basic Configuration
  • Basic Principles
  • Centrifugal Compressors
  • Centrifugal Pumps
  • Centrifugal Pumps Bearings-Seals-Wear-Rings
  • Characterizing the Flow Stream
  • Chemical Process
  • Chemical Solvents
  • Choise Of Process
  • Coil Sizing
  • Compressors
  • Condensate Stabilization
  • Controlling Pulsating Flow
  • Cooling and Lubricating System
  • Crude Oil Treating System
  • Cylinder Sizing
  • Design Considerations
  • Design Considerations
  • Design Procedures for Amine System
  • Direct Conversion of H2S to Sulfur
  • Emulsion Treating Teory
  • Equations
  • Flotation Units
  • Fluid Properties – Basic Principles
  • Fractions from atmospheric and vacuum distillation
  • Gas
  • Gas Dehydration
  • Gas Processing
  • Gas Sweetening Processes
  • Gas Turbine
  • Generic Types of Centrifugal Pumps
  • Glycol Dehydration
  • Glycol Dehydration
  • Gravity Separation
  • Heat Exchangers
  • Hydrates
  • Hydrocarbon
  • Ideas To Enhance Gas Flow
  • Influent Water Quality
  • Installation
  • Instrumentation
  • Liquid Loading
  • LTX Units and Line Heaters
  • Mechanical Design of Pressure Vessels
  • Mechanisms of Heat Transfer
  • News
  • Oil and Gas Processing
  • Oil and Water Separation
  • Oil Production Facility
  • Petrochemical
  • Physical Solvent Processes
  • Potential Operating Problem
  • Pressure Drop in Piping
  • Pressure Relief
  • Pressure Relieving Systems GP
  • Pressure Vessels – Design
  • Process Cooling in Remote Location
  • Process Heat Duty
  • Produced Water Treating System
  • Production Process Component
  • Pumps
  • Reboiler
  • Reciprocating Compressors
  • RECIPROCATING COMPRESSORS
  • Reciprocating Compressors – Components
  • Refining
  • Relief Valve Sizing
  • Separation
  • Separation
  • Shell and Tube Exchangers
  • Solid Bed Absorption
  • Solid Bed Dehydration
  • Specification and Design
  • Three Phase Separator Sizing
  • Tower Pressure
  • Tray
  • Trays and Packing
  • Treater Vessels Sizing
  • Treating Equipment
  • Two Phase Oil and Gas Separation
  • Two Phase Separator Equipment
  • Two Phase Separator Sizing
  • Two Phase Separator Theory
  • Type Of Devices
  • Types Of Compressors
  • Uncategorized
  • Water Treating Equipment
  • Water Treating Theory
  • Well Site Troubleshooting
  • Wellhead Compression
  • Wellhead Surface Equipment

Recent Posts

  • ABS – Mass process by Technip Stone & Webster Process Technology
  • ABS Emulsion process by Technip Stone & Webster Process Technology
  • Revolutionizing Renewables: CO2 to Methanol at Standard Conditions
  • 1,3 Butadiene Process by BASF SE/Air Liquide Global E&C Solutions Germany GmbH
  • New Fortress Energy launches Barcarena LNG terminal in Brazil
© Copyright 2026 – Oil & Gas Process Engineering
Wisteria Theme by WPFriendship ⋅ Powered by WordPress